Sale!

Seminar 40 — Ground Source Systems Commissioning and Closeout: Unique Issues, Avoiding Fatal Flaws and Ensuring Client Satisfaction

$24.50

Conference Proceeding by ASHRAE, 2014

Category:

Description

This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

High performance ground source systems require a little tender, loving care (TLC) to properly bring them online and ensure that the system meets the design intent and owner's needs. This process begins during the design phase and continues through construction and start-up. The design team, commissioning agent and general contractor need to be invested and engaged with the project. Attention to detail and communication between the owner, design team, commissioning agent and contractor permits continuous improvement and prevents poor performance and an unhappy client. Properly executed, this will result in a well-tuned building system and a happy client. This seminar addresses some of the to-dos and not-to-dos during the process.

  1. Commissioning and Close-out Tips for Geothermal Heat Pump (GHP) Systems: Addressing GHP Nuances to Meet the Design Intent and Owners Project Requirement
    Michael Kuk, Member
    Product Contains: Slides (pdf), Recorded Presentation, Audio (mp3)
  2. Best Practices for a Well-Integrated Geothermal Heat Pump System
    Lisa Meline, P.E., Member
    Product Contains: Slides (pdf), Recorded Presentation, Audio (mp3)
  3. Did the Client Get What they Were Promised?
    Kent T. Bell, P.E., Member
    Product Contains: Slides (pdf), Recorded Presentation, Audio (mp3)

Citation: ASHRAE Seminar Recordings, 2014 Annual Conference, Seattle, WA

Product Details

Published:
2014
File Size:
1 file , 190 KB
Product Code(s):
D-SE14Sem40