Sale!

SAE J1938_201507

$39.00

Product Development Process and Checklist for Vehicle Electronic Systems
standard by SAE International, 07/30/2015

Category:

Description

Since it is impossible to be all inclusive and cover every aspect of the design/validation process, this document can be used as a basis for preparation of a more comprehensive and detailed plan that reflects the accumulated “lessons learned” at a particular company. The following areas are addressed in this document: 1.Contemporary perspective including common validation issues and flaws. 2.A Robustness Validation (RV) process based on SAE J1211 handbook and SAE J2628. 3.Design checklists to aid in such a RV process.

Product Details

Published:
07/30/2015
File Size:
1 file , 600 KB
Redline File Size:
2files, 3.7 MB
Sale!

SAE J1938_201507

$39.00

Product Development Process and Checklist for Vehicle Electronic Systems
standard by SAE International, 07/01/2015

Category:

Description

Since it is impossible to be all inclusive and cover every aspect of the design/validation process, this document can be used as a basis for preparation of a more comprehensive and detailed plan that reflects the accumulated “lessons learned” at a particular company. The following areas are addressed in this document:

  1. Contemporary perspective including common validation issues and flaws.

  2. A Robustness Validation (RV) process based on SAE J1211 handbook and SAE J2628.

  3. Design checklists to aid in such a RV process.

Product Details

Published:
07/01/2015
File Size:
1 file , 600 KB