Description
Testing, Adjusting and Balancing (TAB) is just one stage in the design through operation cycle of a building with operation being the longest. Depending upon the size, purpose and function of the building the operator may range from one person to a staff with separate engineering, operating and maintenance departments; however, the objectives and requirements of the operator are still the same. He must provide services when required at reasonable cost, and have a thorough knowledge of all the building systems and their interrelationship.
The following Dos and Don'ts are offered as suggestions to help you, the operator, achieve satisfactory building acceptance.
Citation: Symposium, ASHRAE Transactions, Volume 85, Part 1, Philadelphia, PA
Product Details
- Published:
- 1979
- Number of Pages:
- 5
- File Size:
- 1 file , 300 KB
- Product Code(s):
- D-PH-79-13-5