Description
This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.
The University of Michigan Health System just opened a new 1.1 million square foot children’s and women’s hospital. The University utilized extensive commissioning from the design phase through completion. This session demonstrates how the commissioning authority played a very large role in preparing for the final inspections and achieving the certificate of occupancy.
Opening a New Hospital: A Case Study
Matthew Tunnard, Member
Product Contains: Slides (pdf), Recorded Presentation, Audio (mp3)
Citation: ASHRAE Seminar Recordings, 2013 Winter Conference, Dallas, TX.
Product Details
- Published:
- 2013
- File Size:
- 1 file , 180 KB
- Product Code(s):
- D-DA13Sem64