Description
This article presents two design configurations for the secondary chilled water system in a super high-rise building being constructed in Hong Kong. Both configurations are implemented in this building to test and evaluate their operational performance.
Units: Dual
Citation: ASHRAE Journal, vol. 50, no. 5, May 2008
Product Details
- Published:
- 2008
- Number of Pages:
- 8
- File Size:
- 1 file , 950 KB
- Product Code(s):
- D-AJ08May05