Description
Using integrated design helped the Abbotsford Regional Hospital and Cancer Centre to achieve an annual savings of $475,000. Strategies included high-efficiency (85%) gas-fired hot water boilers, two at 4,900 kW and one at 2,000 kW, and a flue gas heat recovery system for building reheat loads and domestic hot water heating.
Citation: ASHRAE Journal, vol. 54, no. 6, June 2012
Product Details
- Published:
- 2012
- Number of Pages:
- 9
- File Size:
- 1 file , 790 KB
- Product Code(s):
- D-AJ12Jun05