Sale!

PIP PCEPA002

$50.00

Process Analyzer Project Implementation Guidelines [Complete Revision]
standard by Process Industry Practices, 01/01/2016

Category:

Description

This Practice provides guidelines for the design, specification, purchasing, and installation of process analyzer systems.This Practice describes the guidelines for implementation of process analyzer systems. This requires knowledge, integration, and management of multi-disciplinary engineering skills and resources that may bridge several different organizations. This Practice can be used to assist in assessment and definition of roles and responsibilities for those tasks required for a given project.

Product Details

Published:
01/01/2016
Number of Pages:
12
File Size:
1 file , 190 KB
Sale!

PIP PCEPA002

$50.00

Process Analyzer Project Implementation Guidelines (Complete Revision)
standard by Process Industry Practices, 08/01/2006

Category:

Description

This Practice provides guidelines for the design, specification, purchasing, and installation of process analyzer systems for major capital projects.

Product Details

Published:
08/01/2006
Number of Pages:
15
File Size:
1 file , 240 KB
Sale!

PIP PCEPA002

$50.00

Process Analyzer Project Implementation Guidelines
standard by Process Industry Practices, 08/01/2000

Category:

Description

This document is provided as a guide to individuals responsible for the design, specification, purchasing, and installation of process analyzer systems on major capital projects. These projects typically require the participation of the Owner Company, an Engineering and Construction (E&C) contractor, an Analyzer Systems Vendor (ASV) or integrator, and the Analyzer Vendor(s) or Analyzer Original Equipment Manufacturer (OEM). It shall be understood that each analyzer system is an individually engineered product and not a commodity item.

The successful implementation of a process analyzer project requires the knowledge, integration, and management of multi-disciplinary engineering skills and resources that may bridge several different organizations. The detailed information contained within this document on “roles and responsibilities” assumes a “typical” project. The organizational structure may include analyzer resources from an Owner Company, an E&C contractor, an ASV, and the Analyzer Vendor or the Analyzer OEM. However, depending upon the scope of a given project and the organizational structure defined for that project, the “tasks” defined under the roles and responsibilities for participating organizations may change. Use this document to assist in assessment and definition of roles and responsibilities for those tasks requiring completion for a given project. Successful implementation of a project requires continuity of personnel throughout the execution period of a project. In addition to minimizing the overall cost of the project, all efforts should be taken to align resources and minimize duplication of effort.

Product Details

Published:
08/01/2000
File Size:
1 file , 240 KB